The Challenge
Coordinating a full electrical installation across multiple floors of an active construction site, with tight deadlines and multiple trades working simultaneously in the same spaces.
The Solution
Nevics assigned a dedicated project manager who sequenced the electrical work in phases aligned with the construction schedule, ensuring zero clashes with other trades and no delays to the handover date.
Project Highlights
01Full electrical installation across 12 commercial floors
02Main distribution board design and installation
03Emergency lighting and fire alarm integration
04Energy efficient LED lighting throughout
05Generator backup system installation
06Final commissioning and safety certification
Project Details
CategoryCommercial Construction
LocationKingston, Jamaica
Total Area12,000 square metres
Duration8 Months
Year2023-2024


★★★★★
“The team delivered exactly what was promised — on time, on budget, and to a standard we didn't expect from a project this size.”
Client feedback from this project